One accountable system for the services that enable the project.

ETABLIX gives owners, EPCs and major contractors one route to define, procure, mobilise and control the site services that would otherwise consume multiple internal teams and supplier relationships.

01The commercial proposition

Keep your leadership focused on the asset. We integrate the site environment that enables it.

Your project team should be driving design, construction, commissioning and commercial outcomes — not resolving gaps between cabins, utilities, roads, cleaners, security, transport, catering and accommodation providers.

ETABLIX becomes the integration layer between your project requirements and the specialist supply chain. You retain the contractual control appropriate to your risk appetite; we provide the structure, coordination and visibility needed to make the agreed site-services system work.

The client's current operating problem — and our answer to each part of it.

Failure modeCost to the projectETABLIX response
Fragmented scopesGaps, overlaps, double pricing and disputes over responsibility.Single requirements hierarchy and responsibility matrix.
Late mobilisationProductivity loss before permanent works begin.Readiness gates, integrated mobilisation programme and constraint log.
Uncontrolled service demandOvercapacity, undercapacity and avoidable preliminaries.Workforce-linked demand model and rolling forecast.
Supplier silosLocal optimisation while the overall site underperforms.Cross-package KPIs, control accounts and integration management.
Invoice-led managementPayment divorced from verified delivery.EVM, acceptance evidence and package-level forecasting.
Weak demobilisation planningLate removals, unrecovered assets and reinstatement liabilities.Demobilisation baseline established during procurement.
Poor worker experienceAbsenteeism, fatigue, complaints and reputational exposure.Measurable accommodation, welfare, transport and grievance standards.

02Clear scope boundary

ETABLIX is not a main contractor. We enable the one you appoint.

ETABLIX's accountability is defined around the temporary site environment and workforce-support system. The permanent asset remains with the client, EPC or appointed main-works contractor unless a separate, explicit appointment says otherwise.

ETABLIX integrates

  • Temporary site infrastructure and compounds
  • Enabling site civils and reinstatement
  • Temporary MEP and building services
  • Welfare and workforce accommodation
  • Cleaning, facilities and living services
  • Security, access, logistics and transport
  • Site-service procurement and supplier controls

Core project responsibility remains with

  • Permanent asset design
  • Main civil and structural construction
  • Permanent process and production systems
  • Permanent MEP installation
  • Core-asset testing and commissioning
  • Statutory designer or main-contractor duties
  • The client, EPC or appointed main-works contractor

—The two flagship service lines

One site. Every site service. One accountable partner.

ETABLIX gives you one contract, one programme, one budget, one dashboard and one accountable organisation for every temporary site and accommodation service on your project — powered by CONSTRUX, our own construction operating system. Both flagship lines run on one operating system, one supplier framework, one commercial engine and one dashboard.

Total Site Lifecycle Management (TSLM)

One integrated service across four phases
PhaseETABLIX scope
1 · PlanSite-services strategy; site-establishment design; temporary works coordination interface; utilities and logistics studies; supplier market engagement; procurement packages; baseline budget and programme.
2 · EstablishMobilisation programme; offices, welfare and storage; hoarding, fencing, gates, security and access control; temporary roads, parking and pedestrian routes; power, generators and fuel; water, drainage, sewage and waste; ICT and communications.
3 · OperateDaily site-services operations; cleaning, catering and FM; plant and temporary structures; delivery, traffic and logistics management; inspections, maintenance and repairs; supplier coordination, performance and commercial administration; HSE compliance support.
4 · RemoveDemobilisation programme; phased removal and off-hire; final cleaning; land reinstatement; records handover, final accounts and lessons-learned report.

Workforce Village Lifecycle Management (WVLM)

The village as one operating asset, plan to dismantle
PhaseETABLIX scope
1 · PlanWorkforce and occupancy forecasting; village location, feasibility and consents support; accommodation design requirements (rooms, communal, cultural and religious needs); catering strategy; medical and welfare plan; fire and emergency strategy.
2 · EstablishModular rooms and communal facilities; kitchens and dining; utilities (water, power, drainage, sewage); laundry; security and access control; recreation; transport fleet.
3 · OperateOccupancy and room management; catering operations; cleaning and laundry; planned and reactive maintenance; medical and welfare services; transport scheduling; resident conduct and grievance management; supplier performance.
4 · RemovePhased decommissioning matched to the demobilising workforce; asset disposal or redeployment; land reinstatement; closure reporting.

This demand is buyer-side, not invented: the founder authored single-contractor site-management and worker-village requirement packages inside a tier-one grid business — clients asking the market for exactly one contractor to manage all site-services packages from set-up to removal, and one contractor to deliver a worker living village from establishment to dismantling. ETABLIX is the company built to answer that requirement.

—The three delivery models

Three ways to buy it. One standard of control.

Every ETABLIX engagement is delivered under one of three models. Each has a defined responsibility, a defined commercial basis and a defined place in the journey — and they form a ladder: the Advisory package creates a procurement the Management Integrator can run; a successful integration builds the framework and track record that make a Prime appointment safe for everyone.

Model 01 · Advisory — we define it, you buy it.

Fixed professional fee

Our responsibility: strategy, technical requirements, procurement documents and evaluation. Your team retains full contracting control — every supplier contract sits with you.

  • Strategy — site-services and workforce-village strategy: constraints, workforce demand, phasing, utility and logistics studies, and a recommended delivery model with its risk basis.
  • Technical requirements — output specifications, package boundaries, the interface matrix, performance KPIs, evidence and acceptance criteria: a baseline the whole supply chain can price and deliver against.
  • Procurement documents — the files that go to market, as separate documents: instructions to tenderers, conditions of tendering, a scope sheet for every package, the blank pricing schedule the tenderer fills in, the technical and commercial return forms, the form of tender, the tender programme, the contract recommendation and the issue register. Every priced line names the scope item it prices, and the two are reconciled before the pack goes out — because a scope item with no priced line returns after award as a variation, and a priced line with no scope item is priced by every tenderer on a different assumption.
  • Evaluation — clarifications, technical and commercial bid normalisation, exclusion and risk review, and a defensible, auditable award recommendation.

The procurement documents above are assembled by a named agent from a requirements package a competent person has approved, and the scope sheets and the pricing schedule are reconciled by machine before the pack can be issued. How that works, and what the agents are refused.

Choose Advisory when you have the procurement and operational capacity in-house, but need the strategy, specification and tender basis built to contractor standard before you commit the money.

Model 02 · Management Integrator — you contract, we control.

Mobilisation fee plus monthly management fee

Our responsibility: procurement, coordination, commercial administration and performance management. You contract directly with every supplier — ETABLIX never holds your supply-chain money — while one accountable team makes the whole system work.

  • Procurement — market engagement, prequalification, controlled enquiries, evaluation and award recommendations, with contracts placed in your name on terms we help you set.
  • Coordination — one management team owns every supplier interface, mobilisation gate, readiness check and daily operating rhythm across all packages.
  • Commercial administration — monthly valuations and payment recommendations against evidenced Earned Value, change control, cost coding and forecast reporting.
  • Performance management — KPIs, inspections, service-credit administration and supplier escalation, reported live on one CONSTRUX dashboard your leadership can open any day.

Choose Management Integrator when you want direct supplier relationships and direct cash flow, but one party accountable for coordinating, administering and driving performance across the agreed site-services system. This is our core offer.

Model 03 · Prime Service Contractor — one contract, the complete site-services scope.

Integrated contract price with markup and risk allowances

Our responsibility: ETABLIX contracts with all suppliers and delivers the complete site-services scope. One contract, one invoice, one programme, one performance report — and single-point accountability for that entire agreed scope, from first mobilisation to final reinstatement.

Prime means prime for the site-services system — never for the permanent works. Even under Model 03, ETABLIX is not the main contractor: the permanent asset, its design, construction and commissioning remain with the client, EPC or appointed main-works contractor. Nor do we become Principal Contractor under CDM 2015 by default — those duties are taken only by explicit, priced and insured appointment.

  • One integrated contract — the complete site-services or workforce-village scope under a single commercial agreement with defined outputs and acceptance criteria.
  • The complete supply chain, ours — ETABLIX selects, contracts, pays and manages every specialist supplier; supplier performance and supplier risk sit with us, not with your team.
  • Accountability across the lifecycle — mobilisation, daily operation, HSE interface, performance, change and complete removal, all owned by one organisation.
  • Transparent price build-up — audited direct supplier cost plus defined allowances for management and integration, overhead, single-point-accountability risk and a governed contingency controlled against a joint risk register — never a hidden margin.

Choose Prime Service Contractor when a single contract for the whole site-services scope is commercially justified and the funding, credit, liability and mobilisation gates are satisfied — the discipline set out on How it works. We accept these appointments selectively, because a partner that controls its own exposure is a partner that finishes.

03The offer in detail

01

Integrated site infrastructure

We define and coordinate compounds, offices, welfare, roads, hardstanding, fencing, utilities, drainage, access, security, logistics and reinstatement.

Client benefit

A site planned as one operating environment — not assembled package by package.

02

Temporary & enabling civil works

Site-establishment earthworks, temporary drainage, cabin and equipment bases, temporary roads, hardstanding, compounds, fencing, hoarding and reinstatement within the agreed site-services scope.

Client benefit

Clear package boundaries, coordinated interfaces and one performance structure.

03

Temporary MEP & building services

Mechanical, Electrical and Plumbing systems — including HVAC, power distribution, lighting, water supply, sanitary and drainage systems, fire services, controls, testing, commissioning and maintenance — serving compounds, project offices, welfare and workforce accommodation. Not the permanent MEP installation of the core asset.

Client benefit

Technical systems coordinated with civil, accommodation and operational requirements before site pressure exposes gaps.

04

Cleaning & soft FM

Construction and final cleaning, welfare and office cleaning, housekeeping, laundry, consumables, hygiene, waste interfaces and service schedules.

Client benefit

Consistent standards, measurable performance and fewer daily service failures distracting the project team.

05

Workforce villages

Accommodation strategy, village layout, catering, cleaning, transport, security, medical response, recreation, maintenance, operation and dismantling. The village is treated as a temporary operating asset — not a collection of cabins. Capacity, dignity, safety, transport, utilities, community impact and resident experience are designed and controlled as one system, and measured against operating KPIs: occupancy utilisation, room readiness, meal-service compliance, transport reliability, defect response, utility continuity, resident grievances, HSE and welfare, and cost per occupied bed-night.

Client benefit

A functional living system aligned with workforce numbers, shifts, welfare and programme demand.

06

Managed Procurement Desk

One coordinated route for welfare cabins, fencing, hoarding, security, waste, temporary water and power — from specification and sourcing through mobilisation, monthly control, off-hire and demobilisation.

Client benefit

Fewer supplier relationships, one commercial control point and active protection against idle hire and closeout leakage.

07

Procurement & supplier integration

Requirements, package strategy, prequalification, tendering, evaluation, clarifications, mobilisation gates and supplier-performance controls.

Client benefit

A defensible procurement trail and specialist suppliers working to the same baseline.

08

Project controls & assurance

Programme, Earned Value Management, risk, change, evidence, cost reporting, actions, KPIs, executive dashboards and closeout records.

Client benefit

Earlier warning, clearer accountability and a decision-ready view of the complete system.

09

CONSTRUX & VERYX

CONSTRUX supports project-level construction intelligence; VERYX provides enterprise and portfolio-level execution visibility.

Client benefit

Operational expertise supported by stronger data, evidence and management visibility.

Twenty-one specialist trades — planned as one operating environment.

Every trade a UK major site buys, grouped by lifecycle — the same twenty-one categories our supply chain registers under, so scope maps to supplier without translation.

SystemTrades within the systemControl emphasis
Design & planningDesign, survey & temporary works engineering — BS 5975 temporary-works design and checking, utility surveys, site-layout and logistics design.Certified temporary works and no unknowns underground.
Establish the siteTemporary & enabling civil works · ground protection, trackway & wheel-wash · fencing, hoarding & signage · traffic management (Chapter 8).Sequenced mobilisation, interfaces and traffic safety.
Utilities & connectivityTemporary power, generators & fuel · temporary MEP & building services · water, wastewater & sanitation · IT, telecoms & connectivity.Capacity, redundancy, metering and isolation.
Buildings & equipmentModular buildings & site cabins · camp & worker accommodation · plant, equipment & furniture hire — offices, welfare, villages, storage and fit-out.Demand curve, CDM welfare and readiness.
Operate the siteSecurity & access · catering & living services · cleaning & soft FM · waste management & recycling · medical & first-aid services · logistics & materials handling · workforce transport · maintenance & fault response.SLAs, response times and evidence.
CloseoutEnvironmental & closeout — monitoring, pest control, demobilisation, land reinstatement and closeout evidence.Early obligations, cost provision and evidence.

—Advisory products

Defined advisory products with defined outputs.

Each product is a fixed, documented deliverable — not open-ended consultancy hours.

ProductDefined output
Site Systems DiagnosticConstraints, demand, interfaces, delivery model and executive action report.
Site Management Requirements PackageFull output specification, package matrix, KPIs and tender basis — then the tender pack assembled from it: scope sheets, the blank pricing schedule and the return forms, each as its own issuable document.
Workforce Village Requirements PackageCapacity, accommodation, utilities, services, welfare, transport and closeout requirements.
Tender and Supplier IntegrationPQQ/ITT support, clarifications, bid normalisation, risk review and recommendation.
Mobilisation Readiness ReviewReadiness assessment, evidence gaps, constraints and recovery actions.
Project Recovery ReviewOperational diagnosis, EVM and 30/60/90-day recovery plan.

Every engagement is priced against a defined scope, assumptions and exclusions in a written proposal.

04The managed desk model

Aggregation without transferring uncontrolled cashflow risk.

The desk can give the client one operational interface and, where agreed, one invoice. The commercial structure is selected to preserve continuity and keep supplier funding transparent.

Protected

Back-to-back aggregation

ETABLIX consolidates the scope or invoice only where client payment timing, supplier terms and credit exposure are contractually aligned.

Optional

Performance and savings

A baseline can support a share of verified savings from off-hire control, duplicated services, avoided extensions and recovered commercial leakage.

Working-capital rules

  • No unfunded supplier float
  • Mobilisation payment before commitments
  • Client funds received before supplier exposure
  • Back-to-back payment and suspension rights
  • Credit, liability and project-value gates

Workforce-linked demand model

Service capacity follows the workforce curve · Illustrative
peak workforce MOBILISE PEAK OPERATIONS DEMOBILISE — — capacity steps (beds, meals, transport, utilities)
Welfare, accommodation, catering, transport and utilities are stepped against the trade-by-trade workforce curve — avoiding paid-for overcapacity and productivity-killing undercapacity alike.

Off-hire & idle-hire control

Where the managed desk recovers leaked cost · Illustrative
idle hire — cost without demand — — unmanaged hire — desk-managed off-hire — service demand
A single desk that owns off-hire dates, removals and demobilisation closes the gap between falling demand and running hire cost — money projects routinely leak.

05Why use ETABLIX?

In-house coordination looks cheaper — until it consumes the people hired to deliver the core project.

The right model depends on your existing capability, project risk and procurement strategy.

Management areaCoordinated in-houseETABLIX integration
Scope definitionSeparate internal scopes can leave gaps between packages.One requirements baseline, package map and interface matrix.
Supplier procurementThe client sources and evaluates every specialist independently.Coordinated enquiries, comparable returns and controlled recommendations.
InterfacesManagers resolve conflicts while also delivering their core project roles.A named integration function owns dependencies, boundaries and escalation.
MobilisationReadiness is checked package by package.Integrated readiness gates test whether the complete site can operate.
Daily operationsProject leaders chase facilities, logistics and supplier issues.One operating rhythm controls services, performance, incidents and reporting.
Commercial controlCosts and changes sit across different owners and records.Common change, forecast, payment, risk and performance controls.
TechnologySeparate files and dashboards require manual consolidation.CONSTRUX and VERYX connect evidence with project and executive visibility.
CloseoutOff-hire, final accounts and reinstatement become late priorities.Closeout is designed from the beginning with ownership and evidence gates.

06The practical advantage

Less fragmentation. More control.

One accountable interface

A defined route for site-service decisions, escalation and performance.

Specialist capability on demand

Access required disciplines without building a permanent internal department for every package.

Faster mobilisation decisions

Dependencies and readiness are assessed across the site-services system.

Protected management capacity

Project leaders remain focused on the asset, programme and client outcomes.

Stronger commercial visibility

Costs, risks, change and supplier performance use common controls.

Designed closeout

Removal, off-hire, records, reinstatement and commercial closure are planned from the outset.

07Value across the delivery cycle

We add control before problems become project events.

ETABLIX creates value at every stage by connecting temporary site operations, support-service packages, commercial controls and supplier interfaces to the asset delivery plan.

01

Concept & feasibility

Translate workforce, location, access, constraints and operating assumptions into an early site-services strategy.

Value added

Avoid underestimating the space, utilities, welfare, logistics and accommodation needed to make the project executable.

02

Design development

Coordinate temporary and enabling civil works, temporary MEP, temporary works, compounds, access, village and operational requirements as one system.

Value added

Reduce design gaps, spatial conflicts and late interface decisions between separately designed packages.

03

Procurement

Create package scopes, requirements, evaluation criteria, interface schedules and commercial qualifications.

Value added

Improve bid comparability, expose exclusions earlier and procure suppliers against the complete operating requirement.

04

Mobilisation

Control design release, permits, temporary works, supplier readiness, logistics, commissioning and first-use gates.

Value added

Protect the project start by proving that interconnected services can operate safely — not merely that individual suppliers have arrived.

05

Construction & operations

Run one management rhythm for services, KPIs, incidents, cost, change, programme, evidence and escalation.

Value added

Keep the core construction team focused while daily site systems remain coordinated, measured and accountable.

06

Commissioning & transition

Coordinate temporary-service continuity, interfaces with permanent systems, workforce reduction, defects and handover.

Value added

Prevent the transition between construction, commissioning and operations from creating service gaps or duplicated cost.

07

Demobilisation & closeout

Plan off-hire, dismantling, waste, reinstatement, records, retention, final accounts and lessons learned.

Value added

Close physical, commercial and evidence obligations deliberately instead of treating site removal as an afterthought.

08What the client receives

Defined outputs — not vague consultancy hours.

  • Site-services strategy and basis of design
  • Workforce and demand model
  • Package breakdown and interface responsibility matrix
  • Technical scopes, specifications and tender documents
  • Supplier prequalification and tender-evaluation records
  • Integrated mobilisation programme and readiness gates
  • Risk, change, cost, action and performance registers
  • EVM, management and executive reporting
  • Operational procedures and service levels
  • Demobilisation, reinstatement and closeout plan

09When we add the most value

Complex enough to need integration. Important enough to demand accountability.

  • 100+ personnel or rapid workforce growth
  • Five or more critical service interfaces
  • Remote, constrained or high-consequence location
  • Programme duration exceeding 12 months
  • Several specialist suppliers and contracting routes
  • Material mobilisation or continuity risk

Start with the Site Systems Diagnostic.

We map the requirement, identify gaps and interfaces, test the delivery options and recommend the right commercial model before a larger appointment.